PROJECT REFERENCE - WIND FARMS

Customer
Project Name
Work Definition
Year
Renewable Energy Systems Altahullion 26MWPh I & II(NI) Design, supply, installation and commissioning of 33kV switchgear and associated control & protection system. Ph I 2004
Ph II 2007
Renewable Energy Systems Wolfbog 8.75 MW(NI) Design, supply, installation and commissioning of 33kV switchgear and associated control, protection and D-Var systems. 2007
Quinn Group Slieve Rushen 54 MW(NI) Design, supply, installation and commissioning of 33kV containerised substation, including switch gear and control & protection system. 2007
Siemens Ireland Meenachulan 13MW(ROI) Design, supply, erection, installation and commissioning of new 38kV & 10kV equipment. Including construction of new control building and all related cabling and pre-commissioning. 2007
Renewable Energy Systems Lough Hill 12.25 MW(NI) Design, supply, installation and commissioning of 33kV Switchgear and associated control & protection system. 2006
Renewable Energy Systems Callagheen 22.75 MW(NI) Design, supply, installation and commissioning of 33kV Switchgear and associated control & protection system. 2006
Renewable Energy Systems Blackhill 28.6 MW(Scotland) Design, supply, installation and commissioning of 33kV Switchgear and associated control & protection system. 2006
Renewable Energy Systems Forss II9.1 MW(Scotland) Design, supply, installation and commissioning of wind farm control & protection system. 2006
Renewable Energy Systems Mynydd Clogau 14.45 MW(Wales) Design, supply, installation and commissioning of wind farm control & protection system. 2005
Aerotech Blackbanks 6.8 MW (ROI) Design, supply, installation, commissioning and testing of 20kV wind farm control & protection system. 2004-2005
Aertech Snugborough 13.5 MW(NI) Design, supply, installation and commissioning of 13.5MV wind park including all relevant civil works. 2003