| Customer |
Project Name |
Work Definition |
Year |
| Siemens |
RTU(NI) |
Installation of Siemens Remote Terminal Units (RTU) for 24 NIE transmission substations. |
2007- 2008 |
| ESB |
Tralee(ROI) |
Upgrade of 38kV substation “cubical” type switchgear, including new protection and control systems. |
2007 |
| ESB |
38kV Framework Contract(ROI) |
38kV framework contract for the refurbishment including, civil works, electrical customisation, electrical installation & pre-commissioning including supply of protection equipment at 7 substations: Baltinglass, Killybegs, Birr, Newport, Kilcock, Ballinderry, Ballyconnell. |
2005 – 2007 |
| ESB |
MV/LV Substation refurbishment(ROI) |
2-year framework contract for the installation and jointing of LV &MV cables, installation and testing of distribution substations and MV equipment maintenance. |
2006- 2008 |
| Customer |
Project Name |
Work Definition |
Year |
| ESB |
Cherry Wood (ROI) |
Electrical fit out on new 110kV substation using 110kV/MV Siemens HIS equipment. |
2008 |
| ESB |
Adamstown(ROI) |
Electrical construction of new 110kV substation 110/38kV/MV using ABB PASS 110kV equipment. |
2008 |
| NIE |
Carnmoney(N.I) |
Refurbishment of 110kV substation, including replacing circuit breakers, disconnectors, busbars insulators and marshalling kiosk, and all associated civil works. |
2007- 2008 |
| NIE |
Eden(N.I) |
Refurbishment of 110kV substation, including replacing of circuit breakers, disconnectors, busbars insulators and marshalling kiosk, and all associated civil works. |
2007 - 2008 |
| Scottish and Southern Energy |
Millennium(Scotland) |
Construction of new 132kV substation including electrical & civil design, equipment procurement, installation, commissioning, plus all works associated with the construction of the new switchroom. Powerteam are CDM “principal contractor.” |
2007- 2008 |
| Scottish and Southern Energy |
Lunanhead(Scotland) |
Removal of the existing plant and equipment for scrap and replaced with 2 new 132/33kV 90MVA transformers and associated switchgear. Also responsible for civil work including construction of building to contain 33kV switchgear. |
2007- 2008 |
| Scottish and Southern Energy |
St Fergus(Scotland) |
Refurbishment of three 132kV substations and construction of one new 132kV substation, covering design, procurement, civil engineering works and commissioning. |
2007 - 2008 |
| ESB |
Gortawee(ROI) |
Installation of new 110/38 kV transformer bay & related switchgear, including the installation of 110kV and 38kV surge arresters, 110kV neutral VT’s and 38kV changeover switch. Incorporating control cabling and protection units. |
2007- 2008 |
| Scottish and Southern Energy |
Winchester(England) |
Disposal of existing plant and equipment plus the supply, installation and commissioning of the replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation together with responsibility for all associated civil works. |
2006- 2007 |
| Scottish and Southern Energy |
Charleston (Scotland) |
Removal of two 40-year old 30MVA 132kV transformers and the replacement of 7 bulk oil 132kV circuit breakers with 9 new circuit breakers. Repositioning of transformer bays and bus-bar layouts to reduce footprint area. Powerteam responsible for electrical & civil design included equipment procurement, installation and commissioning & foundation alterations, oil containment & cable tracks plus CDM responsibility. |
2006 - 2007 |
| ESB |
110kV Framework Contract(ROI) |
Refurbishment of various 110kV substations throughout Ireland. This work was carried out within live substations with the work areas isolated and de-limited from the live sections. |
2005 - 2007 |
| Western Power Distribution plc |
Llandulph(England) |
Change-out of circuit breakers at 132kV substation. |
2004 & 2006 |
| Scottish and Southern Energy |
Winfrith Heath(England) |
Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at his132/33kV substation plus CDM responsibility. |
2006 |
| ESB |
Nenagh(ROI) |
Electrical fit-out of new 110kV substation. |
2005 - 2006 |
| ESB |
Carriagadroid(ROI) |
Electrical fit-out of new 110kV Substation. |
2005 - 2006 |
| Scottish and Southern Energy |
Mossford & Quoich (Scotland) |
Switchgear, cable replacement, together with protection and control upgrade. |
2005 |
| ESB |
Sealrock, (ROI) |
Electrical construction of new 110kV substation. |
2004 |
| Scottish and Southern Energy |
Orkney Islands |
Installation of capacitor banks at 33kV substation. |
2004 |
| ESB |
Stratford, Galway(ROI) |
Electrical construction of new 110kV substation. |
2002 - 2004 |
| ESB |
Tralee, Kerry(ROI) |
Installation of 110kV capacitor banks and change of transformers. |
2003 - 2004 |
| ESB |
Inniscarra, Cork(ROI) |
Refurbishment and extension of 110kV substation. |
2003 - 2004 |
| ESB |
Tonroe, Blessington(ROI) |
Electrical construction of new 110kV substation. |
2002 - 2003 |
| ESB |
Trien, Rafenne(ROI) |
Installation of 110kV Capacitor Banks. |
2001 - 2003 |