PROJECT REFERENCE - SUBSTATIONS

Return to Projects

LV to 38kV substations

Customer
Project Name
Work Definition
Year
Siemens RTU(NI) Installation of Siemens Remote Terminal Units (RTU) for 24 NIE transmission substations. 2007- 2008
ESB Tralee(ROI) Upgrade of 38kV substation “cubical” type switchgear, including new protection and control systems. 2007
ESB 38kV Framework Contract(ROI) 38kV framework contract for the refurbishment including, civil works, electrical customisation, electrical installation & pre-commissioning including supply of protection equipment at 7 substations: Baltinglass, Killybegs, Birr, Newport, Kilcock, Ballinderry, Ballyconnell. 2005 – 2007
ESB MV/LV Substation refurbishment(ROI) 2-year framework contract for the installation and jointing of LV &MV cables, installation and testing of distribution substations and MV equipment maintenance. 2006- 2008

110/ 132kV substations

Customer
Project Name
Work Definition
Year
ESB Cherry Wood (ROI) Electrical fit out on new 110kV substation using 110kV/MV Siemens HIS equipment. 2008
ESB Adamstown(ROI) Electrical construction of new 110kV substation 110/38kV/MV using ABB PASS 110kV equipment. 2008
NIE Carnmoney(N.I) Refurbishment of 110kV substation, including replacing circuit breakers, disconnectors, busbars insulators and marshalling kiosk, and all associated civil works. 2007- 2008
NIE Eden(N.I) Refurbishment of 110kV substation, including replacing of circuit breakers, disconnectors, busbars insulators and marshalling kiosk, and all associated civil works. 2007 - 2008
Scottish and Southern Energy Millennium(Scotland) Construction of new 132kV substation including electrical & civil design, equipment procurement, installation, commissioning, plus all works associated with the construction of the new switchroom. Powerteam are CDM “principal contractor.” 2007- 2008
Scottish and Southern Energy Lunanhead(Scotland) Removal of the existing plant and equipment for scrap and replaced with 2 new 132/33kV 90MVA transformers and associated switchgear. Also responsible for civil work including construction of building to contain 33kV switchgear. 2007- 2008
Scottish and Southern Energy St Fergus(Scotland) Refurbishment of three 132kV substations and construction of one new 132kV substation, covering design, procurement, civil engineering works and commissioning. 2007 - 2008
ESB Gortawee(ROI) Installation of new 110/38 kV transformer bay & related switchgear, including the installation of 110kV and 38kV surge arresters, 110kV neutral VT’s and 38kV changeover switch. Incorporating control cabling and protection units. 2007- 2008
Scottish and Southern Energy Winchester(England) Disposal of existing plant and equipment plus the supply, installation and commissioning of the replacement 132kV circuit breakers and associated plant and equipment at this 132/33kV substation together with responsibility for all associated civil works. 2006- 2007
Scottish and Southern Energy Charleston (Scotland) Removal of two 40-year old 30MVA 132kV transformers and the replacement of 7 bulk oil 132kV circuit breakers with 9 new circuit breakers. Repositioning of transformer bays and bus-bar layouts to reduce footprint area. Powerteam responsible for electrical & civil design included equipment procurement, installation and commissioning & foundation alterations, oil containment & cable tracks plus CDM responsibility. 2006 - 2007
ESB 110kV Framework Contract(ROI) Refurbishment of various 110kV substations throughout Ireland. This work was carried out within live substations with the work areas isolated and de-limited from the live sections. 2005 - 2007
Western Power Distribution plc Llandulph(England) Change-out of circuit breakers at 132kV substation. 2004 & 2006
Scottish and Southern Energy Winfrith Heath(England) Disposal of existing plant and equipment and the supply, installation and commissioning of replacement 132kV circuit breakers and associated plant and equipment at his132/33kV substation plus CDM responsibility. 2006
ESB Nenagh(ROI) Electrical fit-out of new 110kV substation. 2005 - 2006
ESB Carriagadroid(ROI) Electrical fit-out of new 110kV Substation. 2005 - 2006
Scottish and Southern Energy Mossford & Quoich (Scotland) Switchgear, cable replacement, together with protection and control upgrade. 2005
ESB Sealrock, (ROI) Electrical construction of new 110kV substation. 2004
Scottish and Southern Energy Orkney Islands Installation of capacitor banks at 33kV substation. 2004
ESB Stratford, Galway(ROI) Electrical construction of new 110kV substation. 2002 - 2004
ESB Tralee, Kerry(ROI) Installation of 110kV capacitor banks and change of transformers. 2003 - 2004
ESB Inniscarra, Cork(ROI) Refurbishment and extension of 110kV substation. 2003 - 2004
ESB Tonroe, Blessington(ROI) Electrical construction of new 110kV substation. 2002 - 2003
ESB Trien, Rafenne(ROI) Installation of 110kV Capacitor Banks. 2001 - 2003

220/ 275kV substations

Customer
Project Name
Work Definition
Year
ESB Srananagh, Sligo (ROI) Installation & pre-commissioning for the HV electrical construction of new 220/110kV substation including earth grids. 2003 - 2005
ESB Corduff, Dublin (ROI) Installation & pre-commissioning for the HV electrical construction of new 220/110kV substation comprising of 20 HV bays. 2004 - 2005
Siemens UK PT&D for NGT Elstree(England) Construction of 275kV switchyard. 2004
Siemens UK PT&D for NGT West Thurrock (England) Construction of 275kV switchyard on NGT project and diversion of overhead lines. 2003 to 2004
ESB Clashavoon, Cork (ROI) Installation & pre-commissioning for the HV electrical construction of new 220/110kV substation including earth grids. 2002- 2003

400kV substations

Customer
Project Name
Work Definition
Year
Siemens High Marnham (England) Alterations to and installation of 400kV landing structures, busbars and switchgear associated with the installation of new 400kV quad booster. 2002

top | Return to Projects