SSE 11 & 33kV overhead line clearance (Scotland) Supply of overhead linesmen to assist SSE (Scottish-Hydro region) in rectifying ground clearance issues under the Electricity, Safety, Quality and Continuity Regulations 2002 (ESQCR.) 2007-2008
SSE LV village refurbishment (Scotland) Framework contract for the refurbishment of 122km of low voltage overhead lines in 47 villages. 2006- 2007
WPD Fraddon (England) Construction and refurbishment of 7km of 33kV wood pole overhead line. Includes supply of poles, fittings and 150mm2 copper conductor. 2007
WPD Bodmin (England) Refurbishment of 4km of 33kV wood pole overhead line single circuit. Includes the supply of poles, fittings and 150mm2 Copper conductor. 2007
ESB Low Voltage Refurbishment Refurbishment of LV overhead lines and underground LV distribution system within villages on the ESB network. 2006- 2007
ESB Network Refurbishment Program (ROI) Framework contract for the refurbishment and upgrading of the 10kV rural overhead line system to 20kV. Work was carried out in multi locations on a simultaneous basis, with Powerteam refurbishing over 9,200km of lines during the contract. At it’s peak 330 staff were involved and operational offices were established in counties Donegal, Limerick, Sligo, and Cavan. 2002- 2006
ESB 38kV Overhead LineRefurbishment (ROI) Two-year framework contract for the Survey, design and re-build and uprating of 230km of existing copper Lines by new aluminium lines including the change of all poles. 2002-2006
Scottish Power Power Systems Manweb Region (Wales) Framework contract for the refurbishment of 11kV & 33kV overhead lines, in North Wales. 2003 - 2004

Transmission Overhead lines

Customer
Project Name
Work Definition
Year
SSE St Fergus 132kV power diversion (Scotland) Replacement of tower 47 of the St Fergus 132kV Terminal Tower 47 Circuits VS1 and VS2 including the erection and dismantling of temporary diversion of VS1 circuit using NG type 2 temporary masts. 2007- 2008
WPD Alverdiscott (England) Construction of 6km of 132kV trident single circuit wood pole overhead line. Includes supply of steel terminal tower, steel substation gantry and 200mm2 AAAC conductor. 2007
WPD Hayle Ph I + II(England) Procurement, design and installation of foundations and erection of 1 new L4(M) DT tower with sealing end platforms adjacent to existing tower, and the dismantling and removal of a number of 132kV double circuit towers for scrap. Ph I 2006
Ph II 2007
ESB Lanesboro - Richmond(ROI) Construction of 24km of 110kV portal overhead line between Lanesboro and Richmond 110kV substations, consisting of both woodpole and steel towers. Work included the installation and testing of all materials plus the design, procurement, installation and testing associated with the OPGW conductor. 2006- 2007
ESB 2 x Sligo - Srananagh(ROI) Construction of 2 new 110kV overhead lines between Sligo & Srananagh (6.1km and 9.4km respectively), including the supply OPPC cable, steel sorting, foundation installation, erection of towers, and stringing of cable. 2006- 2007
Western Power Distribution Trostre, Swansea (Wales) Supply and install replacement 132Kv terminal tower. 2006
ESB Flagford - Srananagh, (ROI) Laid and presented the underground/DUCT fibre cable to both substations’ transition joint kits, stringing 55 km of 1 x 48 fibre OPGW and 1km of 1 x 48 fibre OPGW plus jointing, termination and testing. 2005
ESB Auginish - Monateen Re-conductoring and uprating of 8.5km of 110kV line with 430 ACSR conductor, including a 1.5km section, which was re-strung on a double circuit line with one side “live.” 2005
ESB Monateen - Limerick Re-conductoring and uprating of 3km of 110kV line with 430 ACSR conductor, including a 1.5km section, which was re-strung on a double circuit line with one side “live.” 2005
Western Power Distribution Mountain Ash Replacement of 132kV insulators along double circuit tower line. 2004
AMEC Group ltd 110kV AP1 lines Castlereagh to Newtownards Construction of two new 110kV single pole (AP1 construction) overhead lines with a total length of 20km plus the construction of terminal towers. 2004
ESB Charleville- Newmarket Construction of 28km of 110kV wood poles portal construction & towers. 2003